einoKnowledge Base
Start HereVideo Tutorial LibraryModel the SiteDesign the NetworkSimulate & OptimizeValidate, Report & CollaborateOperate & ObserveAI FeaturesAdmin & ReferenceRelease Notes

Release Notes

What’s new in eino

Latest release
September 30, 2026

Release notes for September 30, 2026.

Read the full notes→

2026

September 15, 2026
Release notes for September 15, 2026.
August 31, 2026
Release notes for August 31, 2026.
August 15, 2026
Release notes for August 15, 2026.
July 31, 2026
Release notes for July 31, 2026.
July 15, 2026
Project activity history, cable compliance, faster indoor setup, richer survey metrics, and DAS workflow improvements.
June 30, 2026
Cellular PCI planning, EMF power-density screening, indoor RF calibration, DAS macro-dominance heatmaps, RSRQ and Wi-Fi SNR layers, and faster multi-floor wall loading.
June 15, 2026
Richer walk-test analysis, off-thread outdoor heatmaps, a project usage dashboard, IFC/BIM import, and device-driven planning defaults.
May 31, 2026
A dedicated Validate tab, a DAS Riser Diagram, KMZ/KML path round-tripping, and per-sector client-performance accuracy.
May 15, 2026
A rebuilt antenna configuration modal, smarter wall snapping, precise heatmap-area controls, and multi-page PDF floor-plan handling.
April 30, 2026
Passive DAS design, more reliable heatmap updates, overlay terrain imagery, human-readable monitoring device names, and AI wall-generation fixes.
April 15, 2026
AI stair detection, DAS cross-floor cable routing, customizable diagnostics trigger profiles, P2MP export previews, and canvas reliability fixes.
March 31, 2026
GPU-accelerated OptiX raytracing, AI elevator detection, project video sharing, heatmaps above obstructions, and DWG export improvements.
March 15, 2026
The AP Table with DAS batch editing, terrain elevation editing, the large-format reports revamp, copy-layout-with-hardware, and clearer monitoring graphs.
February 28, 2026
Point cloud rendering, AI monitoring insights, richer monitoring device details, cross-floor riser fixes, and more reliable PDF and multi-floor heatmaps.
February 15, 2026
The live network monitoring dashboard, incident and playbook automation, faster AI wall detection, and more accurate coverage reports.
January 31, 2026
Sharper AI-assisted design with better wall, door, shelf, and column detection, plus outdoor reflection and coverage-area heatmap accuracy.
January 15, 2026
Real-time multi-user collaboration, DWG and walk-test KMZ exports, AI chat context and ROM estimation, and stadium and simulation accuracy improvements.

2025

December 2025
The Stadium Builder, real-time multiplayer collaboration, indoor-outdoor projects, floating obstructions, a dashboard Kanban board, and a sharper AI layout generator.
November 2025
AI-generated layouts, Slack collaboration, richer DAS tooling, and a smarter ROM estimator.
October 2025
AI-powered DAS placement, Rohde & Schwarz field-data integration, multi-factor authentication, and a substantially improved heatmap rendering engine.
September 2025
Side-by-side heatmap comparison, a fully realized 3D indoor environment, project sharing, DAS multi-select, and a revised AI placement algorithm.
August 2025
Full DAS Remote Unit support, uplink heatmaps, smarter floor-plan import, and workflow improvements across the project editor.
July 2025
Sloped surface modeling, a project-scoped AI Assistant, smarter DAS workflows, and a faster dashboard.
June 2025
Doors and windows for indoor floor plans, finer control over map labels and hardware sizing, expanded KMZ exports, and modeling and rendering improvements.
May 2025
Distributed Antenna System support, doors and windows in floor plans, cell load modeling, and workflow improvements across indoor and outdoor planning.
April 2025
Project sharing, smarter AI placement, more accurate cellular interference modeling, and a reworked hardware catalog.
March 2025
Vertical heatmaps, cable tray routing, client performance metrics, and sharper planning tools across indoor and outdoor projects.
February 2025
Richer site modeling, smarter RF calculations, and a faster planning workflow across floors, reports, and exports.
January 2025
Richer outdoor planning tools, smarter antenna controls, and faster report generation for private network projects.

2024