January 15, 2026
Real-time multi-user collaboration, DWG and walk-test KMZ exports, AI chat context and ROM estimation, and stadium and simulation accuracy improvements.
The first half of January delivered real-time multi-user collaboration alongside DWG and walk-test KMZ exports, AI chat context and ROM estimation, plus stadium enhancements and simulation accuracy improvements across projects.
New
Design
Real-Time Multi-User Collaboration
Work on the same project simultaneously with your team. Presence indicators show who is active on the canvas, and scene changes stream live so every collaborator stays in sync without manual refreshes. Learn more
Improved
Projects
- Stadium projects copy cleanly with all 3D mesh objects, and wall thickness computes correctly for accurate RF propagation.
Design
- DAS components stream updates in real time, keeping antenna configuration, cables, and remote units in sync as you edit.
Simulation & Heatmaps
- Multi-floor 3D view now renders each floor's heatmap correctly, with no bleed from adjacent floors.
- Uplink transmit power is now applied correctly, giving accurate SINR and throughput heatmaps for uplink analysis.
- Export walk-test heatmap data as KMZ with colored, labeled hex polygons matching the legend for GIS tools.
Validate & Report
- Export completed designs to DWG with AP names and layers formatted for AutoCAD or iBwave handoff.
Monitoring & AI
- Reference specific project elements in AI chat using the @ mention menu for context-scoped responses.
- Run the ROM estimator to get a budget and bill of materials without committing to an AI-generated AP layout.
Plus other fixes and improvements across the platform.
January 31, 2026
Sharper AI-assisted design with better wall, door, shelf, and column detection, plus outdoor reflection and coverage-area heatmap accuracy.
December 2025
The Stadium Builder, real-time multiplayer collaboration, indoor-outdoor projects, floating obstructions, a dashboard Kanban board, and a sharper AI layout generator.
