einoKnowledge Base
Start HereVideo Tutorial LibraryModel the SiteDesign the NetworkSimulate & OptimizeValidate, Report & CollaborateOperate & ObserveAI FeaturesAdmin & ReferenceRelease Notes

May 31, 2026

A dedicated Validate tab, a DAS Riser Diagram, KMZ/KML path round-tripping, and per-sector client-performance accuracy.

The second half of May 2026 introduces a dedicated Validate tab and a new Riser Diagram for DAS planning, alongside KMZ/KML path round-tripping and improved compliance and per-sector accuracy.

New

Design

Riser Diagram

Plan and review DAS vertical distribution in a new Riser Diagram tab that maps every device, cable, and port connection across all floors in one view. Multi-port antennas, splitter topologies, and disconnected cable ends are all shown explicitly, with cable lengths in your project units, so gaps and misconfigurations are visible before installation. Learn more

Validate & Report

Validate Tab

Compare your simulated network design against real-world measurements in a dedicated, read-only Validate view, accessible directly from the editor top navigation. Import walk-test or drive-test data and overlay a KPI-delta heatmap on top of the design canvas to identify where predicted and measured performance diverge before finalizing a design. Learn more

Improved

Design

  • KMZ/KML import and export now include path geometry so outdoor routes round-trip without loss.

Simulation & Heatmaps

  • Client performance calculations now use each sector's actual position and elevation, improving accuracy for mast-mounted and multi-sector cellular deployments.

Validate & Report

  • Compliance thresholds now draw from the project profile, giving consistent pass/fail results across views.

Plus other fixes and improvements across the platform.

On this page